Winter is a time of building, rebuilding and repair in Saltaire.
Unseen by summer residents, many projects are underway.



 



The Bayshore Terminal bulkheading was reconstructed over the winter.

 

My mid-February, all the old wood bulkheading had been replaced with vinyl.

 




 
The Leigh House is on its new posts.








 

 

Harbor Walk repair looking West.
Harbor Walk near Beach Walk
(December 2004)

 

Shower platform foundations with  the dock in the background.
Rebuilding the shower area at the Bay Beach.

 

 


 

 

Beach, dunes and dune fencing,

In Mid-December, the beach was in good shape.
 (Looking East from West Walk.)

 

 

               
By early February, the beach was shorter and steeper.